Showcase — Completed Works
Rollup last refreshed: 2026-10-13 07:05:51.512495
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
45 works
₹5.42 Cr sanctioned
₹5.19 Cr spent (96%)
02
Construction of Road and Culvert
15 works
₹89.82 L sanctioned
₹65.04 L spent (72%)
03
Works for Flood Control and Protection
5 works
₹71.97 L sanctioned
₹35.19 L spent (49%)
04
Construction of Trench
6 works
₹67.30 L sanctioned
₹55.32 L spent (82%)
05
Constr of Gabion
2 works
₹29.96 L sanctioned
₹29.76 L spent (99%)
06
Land Development
18 works
₹25.78 L sanctioned
₹22.36 L spent (87%)
07
Rural Housing
159 works
₹24.44 L sanctioned
₹24.46 L spent (100%)
08
Repair & Maint of Check Dam/Stop Dam
2 works
₹21.23 L sanctioned
₹20.76 L spent (98%)
09
Plantation
5 works
₹17.93 L sanctioned
₹13.80 L spent (77%)
10
Farm Pond
20 works
₹16.39 L sanctioned
₹13.16 L spent (80%)