Showcase — Completed Works
Rollup last refreshed: 2026-10-13 07:05:51.512495
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
69 works
₹9.64 Cr sanctioned
₹9.55 Cr spent (99%)
02
Works for Flood Control and Protection
22 works
₹2.80 Cr sanctioned
₹2.70 Cr spent (96%)
03
Construction of Percolation Tank
22 works
₹2.07 Cr sanctioned
₹1.98 Cr spent (96%)
04
Cattle Shed
244 works
₹1.98 Cr sanctioned
₹1.95 Cr spent (98%)
05
Construction of Road and Culvert
23 works
₹1.47 Cr sanctioned
₹1.20 Cr spent (82%)
06
Construction of Bund
10 works
₹1.32 Cr sanctioned
₹1.29 Cr spent (98%)
07
Construction of Well
75 works
₹60.00 L sanctioned
₹58.81 L spent (98%)
08
Construction of Trench
4 works
₹24.87 L sanctioned
₹24.46 L spent (98%)
09
Farm Pond
50 works
₹17.14 L sanctioned
₹18.29 L spent (107%)
10
Constr of Cement Concrete Roads
12 works
₹16.60 L sanctioned
₹11.93 L spent (72%)