MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
17,300
Sanctioned (pure scheme)
₹685.94 Cr
Expenditure since inception
₹634.43 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
1,075 works
₹124.70 Cr sanctioned
₹120.15 Cr spent (96%)
02
Works for Flood Control and Protection
937 works
₹109.98 Cr sanctioned
₹96.86 Cr spent (88%)
03
Construction of Bund
744 works
₹89.12 Cr sanctioned
₹85.35 Cr spent (96%)
04
Construction of Road and Culvert
1,405 works
₹79.35 Cr sanctioned
₹72.55 Cr spent (91%)
05
Plantation
758 works
₹59.52 Cr sanctioned
₹52.53 Cr spent (88%)
06
Construction of Tank
255 works
₹31.58 Cr sanctioned
₹30.14 Cr spent (95%)
07
Cattle Shed
1,803 works
₹17.53 Cr sanctioned
₹14.75 Cr spent (84%)
08
Construction of Trench
187 works
₹17.49 Cr sanctioned
₹16.18 Cr spent (93%)
09
Land Development
792 works
₹12.39 Cr sanctioned
₹11.14 Cr spent (90%)
10
Construction of Spur
98 works
₹12.28 Cr sanctioned
₹11.68 Cr spent (95%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 3,710 6.19 6.00
97%
2 Farm Pond 1,879 12.23 12.39
101%
3 Cattle Shed 1,803 17.53 14.75
84%
4 Construction of Road and Culvert 1,405 79.35 72.55
91%
5 Construction of Check Dam/Stop Dam 1,075 124.70 120.15
96%
6 Constr of Cement Concrete Roads 1,008 10.67 8.22
77%
7 Works for Flood Control and Protection 937 109.98 96.86
88%
8 Land Development 792 12.39 11.14
90%
9 Plantation 758 59.52 52.53
88%
10 Construction of Bund 744 89.12 85.35
96%
11 Construction of Well 636 5.18 4.99
96%
12 Construction of Toilets 635 0.56 0.51
91%
13 Deepening / Desilting of Flood Channels 265 11.62 11.00
95%
14 Construction of Tank 255 31.58 30.14
96%
15 Construction of Trench 187 17.49 16.18
93%
16 Renovation of traditional water bodies 106 1.03 2.16
210%
17 Construction of Spur 98 12.28 11.68
95%
18 Roof Water Harvesting on gov/panchayat bldg 86 7.99 7.29
91%
19 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 83 10.48 10.14
97%
20 Construction of Recharge Pits 79 8.70 8.55
98%
21 Boulder Check/Gully Plug 77 9.13 8.27
91%
22 Construction of Percolation Tank 73 4.40 4.21
96%
23 Constr of Aganwadi 67 1.84 1.65
90%
24 Constr of Gabion 61 7.48 7.01
94%
25 Constr of GP Bhawan 50 5.60 3.79
68%
26 Construction of Crematorium 47 1.36 1.30
96%
27 Construction of Embankment 38 5.09 4.75
93%
28 Well Recharge 37 1.24 1.06
86%
29 Community Sanitary Complex 32 0.15 0.14
97%
30 Repair & Maint of Check Dam/Stop Dam 28 3.94 3.74
95%
31 Strengthening of Embankment 24 0.43 0.61
141%
32 Repair & maint of Water Harvesting Structures 24 3.08 2.88
93%
33 Construction of Play field 23 0.86 0.74
86%
34 Underground Dyke for Ground Water Recharge 21 2.04 1.76
86%
35 Repair & maint of Pond/ Tank 20 1.47 1.26
86%
36 Terracing 18 2.06 1.79
87%
37 Constr of Food Grain storage 16 1.84 1.81
98%
38 Construction of NADEP/Vermi Compost Pit 15 0.38 0.35
92%
39 Culvert 15 0.28 0.42
149%
40 Repair & maint of Road 12 2.60 2.51
96%
41 Repair & Maint of Bund 11 1.14 1.03
91%
42 Repair & maint of Percolation Tank 11 0.17 0.16
98%
43 Construction of Fish Drying Infrastructure 8 0.12 0.09
73%
44 Repaire and Maint of NADEP/Vermi Compost Pit 7 0.01 0.01
84%
45 Construction of Other Community Building/Assets 7 0.34 0.33
98%
46 Other Works 6 0.02 0.02
73%
47 Goat Shelter 2 0.04 0.04
98%
48 Grass Land Development 2 0.16 0.06
39%
49 Repair & Maint of Community infrastructure 2 0.05 0.02
31%
50 Bio-gas plant 1 0.00 0.00
61%
51 Construction of Canal 1 0.00 0.00
0%
52 Lift Irrigation 1 0.00 0.02
0%
53 Bio-Fertilizer 1 0.03 0.03
96%
54 Solid and Liquid Waste Management 1 0.02 0.01
40%
Total 17,300 685.94 634.43
All 54 rows (zero-value rows hidden) ⇩ Export to Excel