Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
7 works
₹79.26 L sanctioned
₹59.01 L spent (74%)
02
Farm Pond
17 works
₹52.34 L sanctioned
₹28.23 L spent (54%)
03
Construction of Check Dam/Stop Dam
5 works
₹51.09 L sanctioned
₹39.94 L spent (78%)
04
Cattle Shed
19 works
₹21.75 L sanctioned
₹19.86 L spent (91%)
05
Constr of Cement Concrete Roads
28 works
₹19.84 L sanctioned
₹15.55 L spent (78%)
06
Repair & maint of Road
1 works
₹14.98 L sanctioned
₹12.45 L spent (83%)
07
Works for Flood Control and Protection
3 works
₹11.87 L sanctioned
₹9.62 L spent (81%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹8.73 L sanctioned
₹7.73 L spent (89%)
09
Plantation
22 works
₹7.15 L sanctioned
₹1.46 L spent (20%)
10
Construction of NADEP/Vermi Compost Pit
39 works
₹4.60 L sanctioned
₹4.36 L spent (95%)