Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
8 works
₹82.76 L sanctioned
₹67.03 L spent (81%)
02
Construction of Tank
6 works
₹58.35 L sanctioned
₹42.02 L spent (72%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹37.54 L sanctioned
₹30.40 L spent (81%)
04
Cattle Shed
19 works
₹34.61 L sanctioned
₹32.82 L spent (95%)
05
Lining of Canal
6 works
₹32.15 L sanctioned
₹22.17 L spent (69%)
06
Construction of Check Dam/Stop Dam
4 works
₹31.42 L sanctioned
₹23.36 L spent (74%)
07
Construction of Canal
7 works
₹26.77 L sanctioned
₹21.96 L spent (82%)
08
Works for Flood Control and Protection
4 works
₹26.40 L sanctioned
₹20.18 L spent (76%)
09
Land Development
36 works
₹26.11 L sanctioned
₹30.58 L spent (117%)
10
Constr of Cement Concrete Roads
23 works
₹21.69 L sanctioned
₹21.10 L spent (97%)