Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:49:07.017331
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
21 works
₹71.09 L sanctioned
₹61.84 L spent (87%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
6 works
₹53.14 L sanctioned
₹47.06 L spent (89%)
03
Construction of Road and Culvert
2 works
₹48.81 L sanctioned
₹46.14 L spent (95%)
04
Construction of Trench
10 works
₹26.31 L sanctioned
₹16.71 L spent (64%)
05
Construction of Tank
2 works
₹21.09 L sanctioned
₹17.18 L spent (81%)
06
Works for Flood Control and Protection
2 works
₹20.81 L sanctioned
₹18.94 L spent (91%)
07
Constr of Cement Concrete Roads
8 works
₹15.18 L sanctioned
₹11.10 L spent (73%)
08
Terracing
1 works
₹12.48 L sanctioned
₹11.66 L spent (93%)
09
Lining of Canal
3 works
₹11.69 L sanctioned
₹10.40 L spent (89%)
10
Rural Housing
60 works
₹9.56 L sanctioned
₹8.45 L spent (88%)