Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
8 works
₹1.36 Cr sanctioned
₹1.30 Cr spent (95%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
13 works
₹1.17 Cr sanctioned
₹1.12 Cr spent (95%)
03
Construction of Check Dam/Stop Dam
6 works
₹83.52 L sanctioned
₹78.44 L spent (94%)
04
Land Development
16 works
₹47.44 L sanctioned
₹40.15 L spent (85%)
05
Works for Flood Control and Protection
7 works
₹41.07 L sanctioned
₹31.95 L spent (78%)
06
Construction of Tank
2 works
₹37.70 L sanctioned
₹25.17 L spent (67%)
07
Cattle Shed
1 works
₹27.72 L sanctioned
₹26.35 L spent (95%)
08
Construction of Trench
4 works
₹26.13 L sanctioned
₹21.03 L spent (80%)
09
Construction of Percolation Tank
2 works
₹19.35 L sanctioned
₹18.57 L spent (96%)
10
Construction of Crematorium
1 works
₹14.85 L sanctioned
₹14.56 L spent (98%)