Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
9 works
₹1.10 Cr sanctioned
₹99.50 L spent (90%)
02
Construction of Check Dam/Stop Dam
9 works
₹1.01 Cr sanctioned
₹79.41 L spent (79%)
03
Construction of Road and Culvert
9 works
₹1.00 Cr sanctioned
₹68.77 L spent (68%)
04
Construction of Tank
14 works
₹86.69 L sanctioned
₹74.58 L spent (86%)
05
Construction of Trench
5 works
₹78.93 L sanctioned
₹12.81 L spent (16%)
06
Construction of Percolation Tank
5 works
₹51.40 L sanctioned
₹43.17 L spent (84%)
07
Works for Flood Control and Protection
5 works
₹18.54 L sanctioned
₹13.96 L spent (75%)
08
Repair & maint of Pond/ Tank
2 works
₹15.18 L sanctioned
₹12.64 L spent (83%)
09
Deepening / Desilting of Flood Channels
1 works
₹14.84 L sanctioned
₹15.02 L spent (101%)
10
Constr of Gabion
1 works
₹14.77 L sanctioned
₹12.39 L spent (84%)