Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
10 works
₹1.06 Cr sanctioned
₹99.32 L spent (93%)
02
Construction of Road and Culvert
4 works
₹75.60 L sanctioned
₹64.71 L spent (86%)
03
Works for Flood Control and Protection
4 works
₹54.70 L sanctioned
₹54.18 L spent (99%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹52.45 L sanctioned
₹51.93 L spent (99%)
05
Construction of Bund
2 works
₹15.03 L sanctioned
₹16.30 L spent (108%)
06
Construction of Percolation Tank
1 works
₹14.94 L sanctioned
₹14.88 L spent (100%)
07
Construction of Tank
1 works
₹14.34 L sanctioned
₹14.38 L spent (100%)
08
Repair & maint of Water Harvesting Structures
1 works
₹13.80 L sanctioned
₹13.62 L spent (99%)
09
Rural Housing
76 works
₹12.38 L sanctioned
₹11.87 L spent (96%)
10
Land Development
4 works
₹10.63 L sanctioned
₹4.02 L spent (38%)