Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
11 works
₹1.55 Cr sanctioned
₹1.45 Cr spent (94%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
6 works
₹71.61 L sanctioned
₹62.77 L spent (88%)
03
Construction of Tank
4 works
₹48.18 L sanctioned
₹42.27 L spent (88%)
04
Plantation
4 works
₹30.79 L sanctioned
₹22.81 L spent (74%)
05
Construction of Bund
26 works
₹24.53 L sanctioned
₹20.79 L spent (85%)
06
Construction of Road and Culvert
2 works
₹24.20 L sanctioned
₹21.12 L spent (87%)
07
Repair & maint of Road
1 works
₹19.71 L sanctioned
₹11.98 L spent (61%)
08
Construction of Trench
3 works
₹18.62 L sanctioned
₹13.70 L spent (74%)
09
Repair & Maint of Check Dam/Stop Dam
1 works
₹14.56 L sanctioned
₹14.55 L spent (100%)
10
Farm Pond
5 works
₹11.39 L sanctioned
₹7.51 L spent (66%)