Showcase — Completed Works
Rollup last refreshed: 2026-10-15 06:57:05.982177
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
101 works
₹50.92 L sanctioned
₹46.46 L spent (91%)
02
Construction of Check Dam/Stop Dam
5 works
₹48.83 L sanctioned
₹40.75 L spent (83%)
03
Construction of Tank
4 works
₹38.36 L sanctioned
₹20.68 L spent (54%)
04
Construction of Percolation Tank
3 works
₹27.72 L sanctioned
₹21.39 L spent (77%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.00 L sanctioned
₹6.04 L spent (43%)
06
Constr of Cement Concrete Roads
13 works
₹12.89 L sanctioned
₹12.48 L spent (97%)
07
Works for Flood Control and Protection
1 works
₹6.57 L sanctioned
₹6.58 L spent (100%)
08
Construction of Spur
1 works
₹5.19 L sanctioned
₹4.15 L spent (80%)
09
Repair & maint of Pond/ Tank
3 works
₹4.81 L sanctioned
₹2.13 L spent (44%)
10
Rural Housing
20 works
₹3.38 L sanctioned
₹3.23 L spent (96%)