Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
6 works
₹65.17 L sanctioned
₹57.60 L spent (88%)
02
Cattle Shed
3 works
₹29.50 L sanctioned
₹29.28 L spent (99%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹26.31 L sanctioned
₹24.12 L spent (92%)
04
Construction of Road and Culvert
2 works
₹25.00 L sanctioned
₹23.58 L spent (94%)
05
Construction of Tank
1 works
₹14.76 L sanctioned
₹10.62 L spent (72%)
06
Repair & maint of Water Harvesting Structures
1 works
₹14.00 L sanctioned
₹13.16 L spent (94%)
07
Constr of GP Bhawan
2 works
₹13.90 L sanctioned
₹6.09 L spent (44%)
08
Farm Pond
4 works
₹12.90 L sanctioned
₹8.57 L spent (66%)
09
Constr of Cement Concrete Roads
14 works
₹10.89 L sanctioned
₹9.95 L spent (91%)
10
Repair & maint of Pond/ Tank
2 works
₹10.10 L sanctioned
₹9.09 L spent (90%)