Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
483 works
₹56.08 Cr sanctioned
₹45.88 Cr spent (82%)
02
Construction of Check Dam/Stop Dam
382 works
₹39.38 Cr sanctioned
₹33.22 Cr spent (84%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
380 works
₹37.86 Cr sanctioned
₹32.62 Cr spent (86%)
04
Construction of Tank
282 works
₹32.37 Cr sanctioned
₹25.99 Cr spent (80%)
05
Works for Flood Control and Protection
254 works
₹19.43 Cr sanctioned
₹15.76 Cr spent (81%)
06
Construction of Bund
1,145 works
₹14.66 Cr sanctioned
₹11.47 Cr spent (78%)
07
Constr of Cement Concrete Roads
1,145 works
₹11.93 Cr sanctioned
₹10.42 Cr spent (87%)
08
Cattle Shed
881 works
₹10.27 Cr sanctioned
₹9.14 Cr spent (89%)
09
Construction of Trench
263 works
₹10.08 Cr sanctioned
₹7.50 Cr spent (74%)
10
Plantation
297 works
₹9.27 Cr sanctioned
₹3.40 Cr spent (37%)