Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
55 works
₹1.54 Cr sanctioned
₹1.06 Cr spent (69%)
02
Construction of Road and Culvert
21 works
₹96.19 L sanctioned
₹70.70 L spent (73%)
03
Solid and Liquid Waste Management
33 works
₹81.73 L sanctioned
₹74.18 L spent (91%)
04
Construction of Check Dam/Stop Dam
9 works
₹60.97 L sanctioned
₹57.27 L spent (94%)
05
Construction of NADEP/Vermi Compost Pit
284 works
₹35.57 L sanctioned
₹33.63 L spent (95%)
06
Works for Flood Control and Protection
3 works
₹30.90 L sanctioned
₹30.00 L spent (97%)
07
Rural Housing
164 works
₹28.26 L sanctioned
₹27.22 L spent (96%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹24.34 L sanctioned
₹24.04 L spent (99%)
09
Repair & Maint of Check Dam/Stop Dam
2 works
₹13.47 L sanctioned
₹9.30 L spent (69%)
10
Constr of Cement Concrete Roads
27 works
₹12.41 L sanctioned
₹9.39 L spent (76%)