01
Solid and Liquid Waste Management
26 works
₹1.54 Cr sanctioned
₹1.50 Cr spent (97%)
02
Construction of Road and Culvert
17 works
₹34.65 L sanctioned
₹25.13 L spent (73%)
03
Constr of Cement Concrete Roads
24 works
₹16.93 L sanctioned
₹8.97 L spent (53%)
04
Terracing
3 works
₹16.42 L sanctioned
₹14.74 L spent (90%)
05
Plantation
6 works
₹15.85 L sanctioned
₹5.05 L spent (32%)
06
Construction of Check Dam/Stop Dam
3 works
₹11.54 L sanctioned
₹9.62 L spent (83%)
07
Repair & maint of Water Harvesting Structures
2 works
₹9.60 L sanctioned
₹8.28 L spent (86%)
08
Boulder Check/Gully Plug
5 works
₹8.39 L sanctioned
₹4.78 L spent (57%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹8.18 L sanctioned
₹6.66 L spent (81%)
10
Construction of Bund
3 works
₹7.50 L sanctioned
₹5.69 L spent (76%)