Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
46 works
₹3.15 Cr sanctioned
₹2.74 Cr spent (87%)
02
Solid and Liquid Waste Management
33 works
₹1.56 Cr sanctioned
₹1.49 Cr spent (95%)
03
Plantation
17 works
₹1.11 Cr sanctioned
₹98.16 L spent (89%)
04
Construction of Check Dam/Stop Dam
17 works
₹64.12 L sanctioned
₹63.10 L spent (98%)
05
Constr of Cement Concrete Roads
42 works
₹48.71 L sanctioned
₹29.91 L spent (61%)
06
Construction of Tank
11 works
₹45.71 L sanctioned
₹44.90 L spent (98%)
07
Construction of Percolation Tank
9 works
₹33.41 L sanctioned
₹29.38 L spent (88%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹25.90 L sanctioned
₹25.66 L spent (99%)
09
Repair & maint of Pond/ Tank
1 works
₹24.35 L sanctioned
₹24.23 L spent (99%)
10
Construction of NADEP/Vermi Compost Pit
66 works
₹13.19 L sanctioned