Showcase — Completed Works
Rollup last refreshed: 2026-08-25 08:55:11.826995
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
12 works
₹1.20 Cr sanctioned
₹1.18 Cr spent (98%)
02
Construction of Road and Culvert
22 works
₹1.01 Cr sanctioned
₹75.11 L spent (74%)
03
Construction of Tank
14 works
₹96.86 L sanctioned
₹86.98 L spent (90%)
04
Rural Housing
315 works
₹62.63 L sanctioned
₹59.53 L spent (95%)
05
Farm Pond
14 works
₹51.78 L sanctioned
₹46.10 L spent (89%)
06
Culvert
4 works
₹41.65 L sanctioned
₹41.09 L spent (99%)
07
Constr of Cement Concrete Roads
17 works
₹40.84 L sanctioned
₹19.80 L spent (48%)
08
Boulder Check/Gully Plug
7 works
₹34.12 L sanctioned
₹33.35 L spent (98%)
09
Works for Flood Control and Protection
2 works
₹29.79 L sanctioned
₹29.27 L spent (98%)
10
Repair & maint of Pond/ Tank
4 works
₹25.40 L sanctioned
₹24.72 L spent (97%)