Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
36 works
₹1.27 Cr sanctioned
₹1.04 Cr spent (82%)
02
Construction of Road and Culvert
24 works
₹1.25 Cr sanctioned
₹1.08 Cr spent (86%)
03
Rural Housing
447 works
₹92.68 L sanctioned
₹86.71 L spent (94%)
04
Construction of Trench
11 works
₹89.67 L sanctioned
₹78.18 L spent (87%)
05
Construction of Percolation Tank
7 works
₹53.05 L sanctioned
₹51.57 L spent (97%)
06
Repair & maint of Pond/ Tank
3 works
₹29.61 L sanctioned
₹28.85 L spent (97%)
07
Constr of Cement Concrete Roads
16 works
₹27.78 L sanctioned
₹15.97 L spent (58%)
08
Cattle Shed
1 works
₹27.72 L sanctioned
₹26.72 L spent (96%)
09
Repair & maint of Percolation Tank
4 works
₹27.21 L sanctioned
₹22.86 L spent (84%)
10
Repair & maint of Water Harvesting Structures
2 works
₹23.82 L sanctioned
₹20.90 L spent (88%)