Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
38 works
₹1.89 Cr sanctioned
₹1.06 Cr spent (56%)
02
Constr of Cement Concrete Roads
34 works
₹1.48 Cr sanctioned
₹79.83 L spent (54%)
03
Construction of Check Dam/Stop Dam
18 works
₹1.02 Cr sanctioned
₹77.09 L spent (75%)
04
Cattle Shed
38 works
₹67.30 L sanctioned
₹65.03 L spent (97%)
05
Repair & maint of Pond/ Tank
7 works
₹40.54 L sanctioned
₹16.43 L spent (41%)
06
Construction of Trench
8 works
₹33.35 L sanctioned
₹27.79 L spent (83%)
07
Rural Housing
129 works
₹24.39 L sanctioned
₹23.04 L spent (94%)
08
Culvert
3 works
₹23.94 L sanctioned
₹20.23 L spent (85%)
09
Renovation of traditional water bodies
3 works
₹19.14 L sanctioned
₹15.45 L spent (81%)
10
Farm Pond
3 works
₹18.43 L sanctioned
₹14.00 L spent (76%)