Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Trench
12 works
₹84.23 L sanctioned
₹71.29 L spent (85%)
02
Construction of Check Dam/Stop Dam
14 works
₹60.28 L sanctioned
₹49.05 L spent (81%)
03
Rural Housing
284 works
₹57.80 L sanctioned
₹52.17 L spent (90%)
04
Plantation
18 works
₹49.58 L sanctioned
₹21.71 L spent (44%)
05
Construction of Road and Culvert
11 works
₹45.58 L sanctioned
₹31.13 L spent (68%)
06
Farm Pond
20 works
₹37.49 L sanctioned
₹20.42 L spent (54%)
07
Constr of Cement Concrete Roads
8 works
₹10.79 L sanctioned
₹7.04 L spent (65%)
08
Repair & maint of Percolation Tank
1 works
₹9.44 L sanctioned
₹8.37 L spent (89%)
09
Boulder Check/Gully Plug
3 works
₹7.87 L sanctioned
₹5.38 L spent (68%)
10
Construction of Tank
2 works
₹6.43 L sanctioned
₹5.25 L spent (82%)