Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
28 works
₹1.40 Cr sanctioned
₹1.31 Cr spent (94%)
02
Farm Pond
26 works
₹73.33 L sanctioned
₹54.72 L spent (75%)
03
Construction of Road and Culvert
11 works
₹62.50 L sanctioned
₹42.11 L spent (67%)
04
Cattle Shed
13 works
₹47.04 L sanctioned
₹45.62 L spent (97%)
05
Plantation
20 works
₹37.65 L sanctioned
₹17.21 L spent (46%)
06
Construction of Tank
9 works
₹30.26 L sanctioned
₹23.03 L spent (76%)
07
Works for Flood Control and Protection
2 works
₹29.64 L sanctioned
₹27.79 L spent (94%)
08
Rural Housing
131 works
₹23.93 L sanctioned
₹22.42 L spent (94%)
09
Construction of Well
10 works
₹22.80 L sanctioned
₹19.33 L spent (85%)
10
Construction of Trench
5 works
₹14.07 L sanctioned
₹12.71 L spent (90%)