Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
26 works
₹1.65 Cr sanctioned
₹1.35 Cr spent (82%)
02
Plantation
26 works
₹1.10 Cr sanctioned
₹78.71 L spent (72%)
03
Construction of Road and Culvert
20 works
₹1.03 Cr sanctioned
₹86.91 L spent (84%)
04
Cattle Shed
62 works
₹72.92 L sanctioned
₹54.60 L spent (75%)
05
Rural Housing
331 works
₹63.43 L sanctioned
₹60.23 L spent (95%)
06
Repair & maint of Pond/ Tank
9 works
₹32.97 L sanctioned
₹25.22 L spent (76%)
07
Construction of Trench
7 works
₹31.77 L sanctioned
₹23.94 L spent (75%)
08
Construction of Tank
5 works
₹31.17 L sanctioned
₹28.99 L spent (93%)
09
Works for Flood Control and Protection
3 works
₹23.44 L sanctioned
₹22.49 L spent (96%)
10
Constr of Cement Concrete Roads
12 works
₹22.81 L sanctioned
₹18.41 L spent (81%)