Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
43 works
₹2.08 Cr sanctioned
₹1.91 Cr spent (92%)
02
Construction of Tank
9 works
₹1.52 Cr sanctioned
₹1.33 Cr spent (88%)
03
Construction of Bund
14 works
₹1.22 Cr sanctioned
₹1.06 Cr spent (87%)
04
Rural Housing
644 works
₹1.15 Cr sanctioned
₹1.13 Cr spent (98%)
05
Construction of Road and Culvert
19 works
₹53.53 L sanctioned
₹34.67 L spent (65%)
06
Construction of Percolation Tank
1 works
₹39.06 L sanctioned
₹38.76 L spent (99%)
07
Construction of Trench
5 works
₹33.93 L sanctioned
₹28.27 L spent (83%)
08
Constr of Cement Concrete Roads
12 works
₹26.66 L sanctioned
₹23.24 L spent (87%)
09
Repair & maint of Water Harvesting Structures
1 works
₹24.45 L sanctioned
₹21.88 L spent (89%)
10
Repair & Maint of Check Dam/Stop Dam
2 works
₹19.79 L sanctioned
₹19.71 L spent (100%)