Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
61 works
₹2.70 Cr sanctioned
₹1.93 Cr spent (71%)
02
Construction of Check Dam/Stop Dam
25 works
₹1.67 Cr sanctioned
₹1.58 Cr spent (94%)
03
Construction of Well
47 works
₹1.06 Cr sanctioned
₹70.22 L spent (66%)
04
Construction of Road and Culvert
9 works
₹73.05 L sanctioned
₹59.08 L spent (81%)
05
Farm Pond
13 works
₹39.65 L sanctioned
₹27.12 L spent (68%)
06
Construction of Bund
4 works
₹29.59 L sanctioned
₹25.50 L spent (86%)
07
Repair & maint of Pond/ Tank
2 works
₹29.06 L sanctioned
₹31.79 L spent (109%)
08
Other Works
10 works
₹25.79 L sanctioned
₹18.62 L spent (72%)
09
Constr of Cement Concrete Roads
8 works
₹24.29 L sanctioned
₹16.42 L spent (68%)
10
Terracing
3 works
₹15.07 L sanctioned
₹14.59 L spent (97%)