Showcase — Completed Works
Rollup last refreshed: 2026-10-16 07:05:50.316766
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
33 works
₹2.54 Cr sanctioned
₹2.44 Cr spent (96%)
02
Construction of Road and Culvert
10 works
₹1.58 Cr sanctioned
₹1.41 Cr spent (90%)
03
Construction of Check Dam/Stop Dam
33 works
₹1.39 Cr sanctioned
₹1.25 Cr spent (90%)
04
Construction of Bund
55 works
₹88.00 L sanctioned
₹81.90 L spent (93%)
05
Construction of Well
27 works
₹75.92 L sanctioned
₹68.10 L spent (90%)
06
Rural Housing
255 works
₹44.66 L sanctioned
₹43.41 L spent (97%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
10 works
₹42.96 L sanctioned
₹34.19 L spent (80%)
08
Culvert
5 works
₹42.60 L sanctioned
₹41.10 L spent (96%)
09
Farm Pond
12 works
₹19.04 L sanctioned
₹17.11 L spent (90%)
10
Boulder Check/Gully Plug
12 works
₹17.49 L sanctioned
₹16.34 L spent (93%)