Showcase — Completed Works
Rollup last refreshed: 2026-08-26 17:54:53.293656
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
34 works
₹1.85 Cr sanctioned
₹1.47 Cr spent (79%)
02
Construction of Bund
16 works
₹1.72 Cr sanctioned
₹1.61 Cr spent (94%)
03
Construction of Percolation Tank
10 works
₹84.86 L sanctioned
₹71.44 L spent (84%)
04
Repair & maint of Pond/ Tank
12 works
₹68.63 L sanctioned
₹67.34 L spent (98%)
05
Construction of Road and Culvert
5 works
₹41.08 L sanctioned
₹27.31 L spent (66%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
8 works
₹38.54 L sanctioned
₹29.58 L spent (77%)
07
Construction of Tank
4 works
₹30.15 L sanctioned
₹28.13 L spent (93%)
08
Constr of Cement Concrete Roads
10 works
₹24.82 L sanctioned
₹6.85 L spent (28%)
09
Rural Housing
120 works
₹19.73 L sanctioned
₹19.28 L spent (98%)
10
Construction of Trench
2 works
₹17.25 L sanctioned
₹14.95 L spent (87%)