Showcase — Completed Works
Rollup last refreshed: 2026-08-26 17:54:53.293656
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
22 works
₹1.79 Cr sanctioned
₹1.67 Cr spent (94%)
02
Construction of Tank
40 works
₹1.71 Cr sanctioned
₹1.66 Cr spent (97%)
03
Construction of Road and Culvert
13 works
₹1.61 Cr sanctioned
₹1.25 Cr spent (78%)
04
Construction of Check Dam/Stop Dam
38 works
₹1.08 Cr sanctioned
₹72.39 L spent (67%)
05
Construction of Bund
18 works
₹1.00 Cr sanctioned
₹87.51 L spent (87%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
16 works
₹88.21 L sanctioned
₹74.77 L spent (85%)
07
Plantation
10 works
₹32.42 L sanctioned
₹8.76 L spent (27%)
08
Repair & maint of Road
3 works
₹29.27 L sanctioned
₹20.95 L spent (72%)
09
Rural Housing
156 works
₹26.54 L sanctioned
₹26.01 L spent (98%)
10
Repair & maint of Pond/ Tank
2 works
₹23.35 L sanctioned
₹23.33 L spent (100%)