Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
23 works
₹1.96 Cr sanctioned
₹1.82 Cr spent (93%)
02
Construction of Road and Culvert
12 works
₹1.39 Cr sanctioned
₹1.18 Cr spent (85%)
03
Construction of Well
37 works
₹1.08 Cr sanctioned
₹1.01 Cr spent (94%)
04
Construction of Check Dam/Stop Dam
22 works
₹79.31 L sanctioned
₹63.04 L spent (79%)
05
Repair & maint of Pond/ Tank
9 works
₹74.66 L sanctioned
₹65.00 L spent (87%)
06
Cattle Shed
1 works
₹37.85 L sanctioned
₹36.20 L spent (96%)
07
Constr of Cement Concrete Roads
18 works
₹31.41 L sanctioned
₹23.91 L spent (76%)
08
Well Recharge
7 works
₹24.93 L sanctioned
₹25.13 L spent (101%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹17.87 L sanctioned
₹16.49 L spent (92%)
10
Construction of Tank
10 works
₹17.43 L sanctioned
₹16.63 L spent (95%)