Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
22 works
₹3.29 Cr sanctioned
₹2.71 Cr spent (83%)
02
Construction of Percolation Tank
16 works
₹1.21 Cr sanctioned
₹81.23 L spent (67%)
03
Construction of Tank
6 works
₹87.03 L sanctioned
₹81.83 L spent (94%)
04
Constr of Cement Concrete Roads
44 works
₹82.34 L sanctioned
₹58.66 L spent (71%)
05
Construction of Check Dam/Stop Dam
14 works
₹61.56 L sanctioned
₹50.58 L spent (82%)
06
Construction of Well
24 works
₹60.94 L sanctioned
₹53.49 L spent (88%)
07
Rural Housing
357 works
₹58.80 L sanctioned
₹57.92 L spent (98%)
08
Construction of Bund
5 works
₹51.99 L sanctioned
₹45.23 L spent (87%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹42.40 L sanctioned
₹36.07 L spent (85%)
10
Repair & maint of Percolation Tank
5 works
₹38.61 L sanctioned
₹29.12 L spent (75%)