Showcase — Completed Works
Rollup last refreshed: 2026-10-14 07:05:44.899714
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
23 works
₹1.83 Cr sanctioned
₹1.66 Cr spent (91%)
02
Construction of Road and Culvert
14 works
₹1.20 Cr sanctioned
₹99.59 L spent (83%)
03
Construction of Check Dam/Stop Dam
23 works
₹80.54 L sanctioned
₹70.59 L spent (88%)
04
Construction of Well
22 works
₹57.96 L sanctioned
₹51.32 L spent (89%)
05
Construction of Tank
4 works
₹46.40 L sanctioned
₹43.69 L spent (94%)
06
Rural Housing
261 works
₹44.98 L sanctioned
₹44.52 L spent (99%)
07
Construction of Trench
5 works
₹42.91 L sanctioned
₹42.85 L spent (100%)
08
Culvert
7 works
₹36.36 L sanctioned
₹29.76 L spent (82%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹34.21 L sanctioned
₹30.21 L spent (88%)
10
Constr of Cement Concrete Roads
34 works
₹30.92 L sanctioned
₹18.65 L spent (60%)