Showcase — Completed Works
Rollup last refreshed: 2026-08-23 08:31:42.168333
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
34 works
₹1.68 Cr sanctioned
₹1.43 Cr spent (85%)
02
Construction of Road and Culvert
15 works
₹1.54 Cr sanctioned
₹1.15 Cr spent (74%)
03
Construction of Percolation Tank
13 works
₹1.38 Cr sanctioned
₹1.36 Cr spent (98%)
04
Construction of Bund
16 works
₹1.02 Cr sanctioned
₹1.01 Cr spent (99%)
05
Constr of Cement Concrete Roads
29 works
₹59.14 L sanctioned
₹42.11 L spent (71%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
10 works
₹48.11 L sanctioned
₹47.95 L spent (100%)
07
Repair & maint of Pond/ Tank
6 works
₹45.04 L sanctioned
₹43.28 L spent (96%)
08
Rural Housing
172 works
₹28.94 L sanctioned
₹28.22 L spent (98%)
09
Farm Pond
4 works
₹19.17 L sanctioned
₹19.17 L spent (100%)
10
Renovation of traditional water bodies
3 works
₹15.84 L sanctioned
₹13.79 L spent (87%)