Showcase — Completed Works
Rollup last refreshed: 2026-08-25 08:55:11.826995
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
10 works
₹1.50 Cr sanctioned
₹1.35 Cr spent (90%)
02
Construction of Check Dam/Stop Dam
28 works
₹98.57 L sanctioned
₹78.02 L spent (79%)
03
Construction of Tank
5 works
₹65.02 L sanctioned
₹63.07 L spent (97%)
04
Construction of Percolation Tank
12 works
₹64.70 L sanctioned
₹57.64 L spent (89%)
05
Repair & maint of Pond/ Tank
5 works
₹51.77 L sanctioned
₹51.65 L spent (100%)
06
Rural Housing
225 works
₹38.46 L sanctioned
₹38.23 L spent (99%)
07
Constr of Cement Concrete Roads
20 works
₹19.37 L sanctioned
₹16.32 L spent (84%)
08
Farm Pond
16 works
₹18.46 L sanctioned
₹15.16 L spent (82%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹14.77 L sanctioned
₹15.24 L spent (103%)
10
Construction of Crematorium
1 works
₹14.56 L sanctioned
₹14.38 L spent (99%)