Showcase — Completed Works
Rollup last refreshed: 2026-08-25 08:55:11.826995
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
13 works
₹1.32 Cr sanctioned
₹99.34 L spent (75%)
02
Construction of Percolation Tank
13 works
₹1.31 Cr sanctioned
₹1.24 Cr spent (95%)
03
Construction of Check Dam/Stop Dam
16 works
₹97.13 L sanctioned
₹77.85 L spent (80%)
04
Repair & maint of Pond/ Tank
3 works
₹27.95 L sanctioned
₹27.90 L spent (100%)
05
Construction of Well
9 works
₹25.45 L sanctioned
₹22.28 L spent (88%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹22.35 L sanctioned
₹19.32 L spent (86%)
07
Constr of Cement Concrete Roads
12 works
₹18.36 L sanctioned
₹8.85 L spent (48%)
08
Construction of Trench
1 works
₹14.96 L sanctioned
₹14.43 L spent (96%)
09
Construction of Crematorium
1 works
₹13.77 L sanctioned
₹13.49 L spent (98%)
10
Rural Housing
78 works
₹13.06 L sanctioned
₹12.85 L spent (98%)