Showcase — Completed Works
Rollup last refreshed: 2026-08-23 08:31:42.168333
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
21 works
₹1.77 Cr sanctioned
₹1.72 Cr spent (97%)
02
Construction of Check Dam/Stop Dam
34 works
₹1.61 Cr sanctioned
₹1.46 Cr spent (90%)
03
Construction of Tank
5 works
₹74.01 L sanctioned
₹72.19 L spent (98%)
04
Culvert
6 works
₹55.53 L sanctioned
₹51.44 L spent (93%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
10 works
₹47.99 L sanctioned
₹47.73 L spent (99%)
06
Construction of Bund
5 works
₹45.95 L sanctioned
₹44.95 L spent (98%)
07
Constr of Cement Concrete Roads
21 works
₹44.84 L sanctioned
₹40.69 L spent (91%)
08
Rural Housing
220 works
₹37.53 L sanctioned
₹36.78 L spent (98%)
09
Repair & maint of Pond/ Tank
3 works
₹30.28 L sanctioned
₹30.15 L spent (100%)
10
Construction of Percolation Tank
6 works
₹30.06 L sanctioned
₹24.71 L spent (82%)