Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
14 works
₹1.61 Cr sanctioned
₹1.32 Cr spent (82%)
02
Construction of Check Dam/Stop Dam
34 works
₹1.59 Cr sanctioned
₹1.29 Cr spent (81%)
03
Repair & maint of Pond/ Tank
12 works
₹86.08 L sanctioned
₹76.84 L spent (89%)
04
Constr of Cement Concrete Roads
33 works
₹63.19 L sanctioned
₹46.41 L spent (73%)
05
Construction of Percolation Tank
12 works
₹60.84 L sanctioned
₹51.95 L spent (85%)
06
Plantation
9 works
₹44.84 L sanctioned
₹30.73 L spent (69%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
6 works
₹33.48 L sanctioned
₹30.33 L spent (91%)
08
Culvert
4 works
₹26.75 L sanctioned
₹19.72 L spent (74%)
09
Deepening / Desilting of Flood Channels
2 works
₹22.32 L sanctioned
₹21.85 L spent (98%)
10
Construction of Bund
4 works
₹21.29 L sanctioned
₹16.28 L spent (76%)