Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
11 works
₹67.64 L sanctioned
₹75.43 L spent (112%)
02
Repair & maint of Pond/ Tank
5 works
₹46.33 L sanctioned
₹44.41 L spent (96%)
03
Construction of Check Dam/Stop Dam
4 works
₹41.74 L sanctioned
₹34.10 L spent (82%)
04
Construction of Well
15 works
₹39.07 L sanctioned
₹36.37 L spent (93%)
05
Rural Housing
125 works
₹21.21 L sanctioned
₹20.84 L spent (98%)
06
Constr of Cement Concrete Roads
12 works
₹19.02 L sanctioned
₹16.63 L spent (87%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.77 L sanctioned
₹13.71 L spent (93%)
08
Construction of Tank
1 works
₹14.22 L sanctioned
₹11.72 L spent (82%)
09
Renovation of traditional water bodies
1 works
₹9.99 L sanctioned
₹9.98 L spent (100%)
10
Construction of Percolation Tank
3 works
₹9.89 L sanctioned
₹9.59 L spent (97%)