Showcase — Completed Works
Rollup last refreshed: 2026-09-07 07:03:15.513604
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
42 works
₹1.17 Cr sanctioned
₹1.05 Cr spent (90%)
02
Constr of Cement Concrete Roads
31 works
₹71.88 L sanctioned
₹59.38 L spent (83%)
03
Construction of Road and Culvert
11 works
₹70.90 L sanctioned
₹57.28 L spent (81%)
04
Works for Flood Control and Protection
5 works
₹56.75 L sanctioned
₹55.73 L spent (98%)
05
Construction of Check Dam/Stop Dam
13 works
₹39.70 L sanctioned
₹43.78 L spent (110%)
06
Rural Housing
163 works
₹29.79 L sanctioned
₹28.92 L spent (97%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹25.38 L sanctioned
₹25.33 L spent (100%)
08
Construction of Trench
6 works
₹23.14 L sanctioned
₹13.16 L spent (57%)
09
Construction of Tank
2 works
₹19.83 L sanctioned
₹17.85 L spent (90%)
10
Well Recharge
10 works
₹17.99 L sanctioned
₹15.12 L spent (84%)