Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
38 works
₹96.86 L sanctioned
₹1.28 Cr spent (132%)
02
Construction of Check Dam/Stop Dam
21 works
₹72.21 L sanctioned
₹86.59 L spent (120%)
03
Rural Housing
253 works
₹51.50 L sanctioned
₹49.66 L spent (96%)
04
Construction of Bund
10 works
₹42.71 L sanctioned
₹27.48 L spent (64%)
05
Construction of Trench
15 works
₹28.88 L sanctioned
₹31.63 L spent (110%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹27.41 L sanctioned
₹24.44 L spent (89%)
07
Farm Pond
34 works
₹24.89 L sanctioned
₹21.59 L spent (87%)
08
Construction of Canal
1 works
₹24.82 L sanctioned
₹13.39 L spent (54%)
09
Repair & maint of Pond/ Tank
3 works
₹22.64 L sanctioned
₹20.52 L spent (91%)
10
Construction of Play field
1 works
₹11.39 L sanctioned
₹10.89 L spent (96%)