Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
31 works
₹2.13 Cr sanctioned
₹2.39 Cr spent (112%)
02
Construction of Well
27 works
₹81.80 L sanctioned
₹85.48 L spent (104%)
03
Construction of Road and Culvert
12 works
₹78.50 L sanctioned
₹50.41 L spent (64%)
04
Construction of Tank
4 works
₹58.07 L sanctioned
₹57.33 L spent (99%)
05
Repair & maint of Pond/ Tank
5 works
₹44.44 L sanctioned
₹43.29 L spent (97%)
06
Rural Housing
254 works
₹40.81 L sanctioned
₹40.28 L spent (99%)
07
Construction of Percolation Tank
2 works
₹29.69 L sanctioned
₹29.15 L spent (98%)
08
Constr of Cement Concrete Roads
23 works
₹29.51 L sanctioned
₹30.45 L spent (103%)
09
Farm Pond
9 works
₹28.77 L sanctioned
₹23.85 L spent (83%)
10
Repair & Maint of Check Dam/Stop Dam
1 works
₹23.81 L sanctioned
₹23.78 L spent (100%)