Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
21 works
₹1.99 Cr sanctioned
₹1.97 Cr spent (99%)
02
Construction of Road and Culvert
16 works
₹1.24 Cr sanctioned
₹1.21 Cr spent (97%)
03
Construction of Well
46 works
₹76.60 L sanctioned
₹1.03 Cr spent (134%)
04
Rural Housing
275 works
₹42.81 L sanctioned
₹42.45 L spent (99%)
05
Construction of Tank
5 works
₹38.75 L sanctioned
₹37.91 L spent (98%)
06
Farm Pond
14 works
₹27.09 L sanctioned
₹39.01 L spent (144%)
07
Plantation
13 works
₹24.97 L sanctioned
₹15.15 L spent (61%)
08
Construction of Check Dam/Stop Dam
36 works
₹17.86 L sanctioned
₹68.49 L spent (383%)
09
Repair & maint of Pond/ Tank
2 works
₹16.09 L sanctioned
₹16.01 L spent (100%)
10
Construction of Trench
3 works
₹11.65 L sanctioned
₹9.75 L spent (84%)