Showcase — Completed Works
Rollup last refreshed: 2026-10-13 07:05:51.512495
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
10 works
₹94.55 L sanctioned
₹81.14 L spent (86%)
02
Construction of Road and Culvert
4 works
₹48.63 L sanctioned
₹39.10 L spent (80%)
03
Construction of Trench
11 works
₹47.92 L sanctioned
₹42.35 L spent (88%)
04
Construction of Tank
5 works
₹46.48 L sanctioned
₹42.57 L spent (92%)
05
Plantation
16 works
₹39.64 L sanctioned
₹12.51 L spent (32%)
06
Farm Pond
9 works
₹30.87 L sanctioned
₹20.50 L spent (66%)
07
Works for Flood Control and Protection
2 works
₹28.16 L sanctioned
₹27.85 L spent (99%)
08
Rural Housing
145 works
₹27.17 L sanctioned
₹26.64 L spent (98%)
09
Constr of Gabion
6 works
₹26.64 L sanctioned
₹25.93 L spent (97%)
10
Repair & maint of Pond/ Tank
2 works
₹13.50 L sanctioned
₹13.64 L spent (101%)