Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
17 works
₹2.74 Cr sanctioned
₹2.14 Cr spent (78%)
02
Construction of Percolation Tank
3 works
₹23.10 L sanctioned
₹21.78 L spent (94%)
03
Constr of Cement Concrete Roads
23 works
₹17.87 L sanctioned
₹17.18 L spent (96%)
04
Construction of Trench
3 works
₹11.75 L sanctioned
₹9.74 L spent (83%)
05
Construction of Well
4 works
₹9.23 L sanctioned
₹6.97 L spent (76%)
06
Construction of Check Dam/Stop Dam
2 works
₹8.24 L sanctioned
₹8.00 L spent (97%)
07
Construction of Toilets
149 works
₹7.72 L sanctioned
₹6.08 L spent (79%)
08
Construction of Tank
1 works
₹6.09 L sanctioned
₹5.64 L spent (93%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹6.03 L sanctioned
₹4.61 L spent (76%)
10
Repair & maint of Pond/ Tank
1 works
₹5.12 L sanctioned
₹3.35 L spent (66%)