Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
18 works
₹1.77 Cr sanctioned
₹1.21 Cr spent (68%)
02
Construction of Percolation Tank
15 works
₹76.86 L sanctioned
₹66.43 L spent (86%)
03
Construction of Well
18 works
₹76.55 L sanctioned
₹76.43 L spent (100%)
04
Plantation
35 works
₹45.79 L sanctioned
₹26.18 L spent (57%)
05
Construction of Trench
26 works
₹43.67 L sanctioned
₹34.13 L spent (78%)
06
Construction of Tank
6 works
₹34.38 L sanctioned
₹25.86 L spent (75%)
07
Constr of Cement Concrete Roads
32 works
₹34.31 L sanctioned
₹22.07 L spent (64%)
08
Rural Housing
169 works
₹27.96 L sanctioned
₹27.60 L spent (99%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
12 works
₹17.38 L sanctioned
₹14.99 L spent (86%)
10
Repair & maint of Road
1 works
₹14.97 L sanctioned
₹14.68 L spent (98%)