Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
34 works
₹3.36 Cr sanctioned
₹2.47 Cr spent (74%)
02
Construction of Well
137 works
₹2.80 Cr sanctioned
₹2.69 Cr spent (96%)
03
Farm Pond
65 works
₹1.25 Cr sanctioned
₹86.77 L spent (70%)
04
Plantation
48 works
₹1.22 Cr sanctioned
₹34.82 L spent (29%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
17 works
₹1.07 Cr sanctioned
₹84.85 L spent (79%)
06
Rural Housing
573 works
₹95.11 L sanctioned
₹92.40 L spent (97%)
07
Construction of Check Dam/Stop Dam
6 works
₹54.72 L sanctioned
₹55.62 L spent (102%)
08
Construction of Recharge Pits
11 works
₹46.31 L sanctioned
₹37.43 L spent (81%)
09
Construction of Percolation Tank
5 works
₹41.04 L sanctioned
₹25.87 L spent (63%)
10
Cattle Shed
1 works
₹37.85 L sanctioned
₹34.66 L spent (92%)