Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
17 works
₹1.73 Cr sanctioned
₹1.35 Cr spent (78%)
02
Plantation
33 works
₹1.07 Cr sanctioned
₹58.91 L spent (55%)
03
Construction of Percolation Tank
9 works
₹87.54 L sanctioned
₹81.78 L spent (93%)
04
Constr of Cement Concrete Roads
31 works
₹68.87 L sanctioned
₹55.67 L spent (81%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹64.18 L sanctioned
₹59.20 L spent (92%)
06
Construction of Trench
28 works
₹61.95 L sanctioned
₹53.44 L spent (86%)
07
Rural Housing
232 works
₹41.56 L sanctioned
₹40.23 L spent (97%)
08
Works for Flood Control and Protection
2 works
₹19.81 L sanctioned
₹19.26 L spent (97%)
09
Construction of Tank
1 works
₹15.00 L sanctioned
₹14.91 L spent (99%)
10
Construction of Embankment
1 works
₹14.99 L sanctioned
₹14.27 L spent (95%)