Showcase — Completed Works
Rollup last refreshed: 2026-08-27 14:06:46.546602
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
29 works
₹1.82 Cr sanctioned
₹1.50 Cr spent (82%)
02
Construction of Check Dam/Stop Dam
16 works
₹1.54 Cr sanctioned
₹1.53 Cr spent (100%)
03
Renovation of traditional water bodies
14 works
₹47.47 L sanctioned
₹39.79 L spent (84%)
04
Rural Housing
144 works
₹28.92 L sanctioned
₹27.11 L spent (94%)
05
Works for Flood Control and Protection
3 works
₹15.25 L sanctioned
₹14.82 L spent (97%)
06
Construction of Trench
14 works
₹13.63 L sanctioned
₹13.26 L spent (97%)
07
Construction of Percolation Tank
5 works
₹13.26 L sanctioned
₹13.62 L spent (103%)
08
Land Development
9 works
₹7.70 L sanctioned
₹7.08 L spent (92%)
09
Plantation
3 works
₹6.95 L sanctioned
₹65,532 spent (9%)
10
Farm Pond
6 works
₹5.51 L sanctioned
₹3.66 L spent (66%)