Showcase — Completed Works
Rollup last refreshed: 2026-08-26 17:54:53.293656
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
20 works
₹1.40 Cr sanctioned
₹1.06 Cr spent (76%)
02
Construction of Check Dam/Stop Dam
17 works
₹1.14 Cr sanctioned
₹91.11 L spent (80%)
03
Construction of Trench
52 works
₹78.23 L sanctioned
₹71.27 L spent (91%)
04
Construction of Percolation Tank
9 works
₹62.84 L sanctioned
₹60.92 L spent (97%)
05
Construction of Well
14 works
₹32.09 L sanctioned
₹31.40 L spent (98%)
06
Rural Housing
110 works
₹22.00 L sanctioned
₹20.23 L spent (92%)
07
Farm Pond
10 works
₹18.83 L sanctioned
₹18.03 L spent (96%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹17.12 L sanctioned
₹12.28 L spent (72%)
09
Land Development
4 works
₹16.16 L sanctioned
₹10.38 L spent (64%)
10
Plantation
13 works
₹15.29 L sanctioned
₹17.69 L spent (116%)