Showcase — Completed Works
Rollup last refreshed: 2026-08-26 17:54:53.293656
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
22 works
₹4.48 Cr sanctioned
₹3.52 Cr spent (79%)
02
Construction of Check Dam/Stop Dam
21 works
₹2.83 Cr sanctioned
₹2.25 Cr spent (80%)
03
Construction of Tank
4 works
₹55.84 L sanctioned
₹38.82 L spent (70%)
04
Construction of Road and Culvert
7 works
₹50.33 L sanctioned
₹29.05 L spent (58%)
05
Construction of Well
45 works
₹49.98 L sanctioned
₹43.77 L spent (88%)
06
Rural Housing
279 works
₹45.83 L sanctioned
₹39.08 L spent (85%)
07
Plantation
5 works
₹23.16 L sanctioned
₹6.51 L spent (28%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹9.56 L sanctioned
₹1.91 L spent (20%)
09
Repair & maint of Percolation Tank
1 works
₹9.52 L sanctioned
₹4.28 L spent (45%)
10
Construction of Trench
2 works
₹5.10 L sanctioned
₹3.58 L spent (70%)