MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
30,361
Sanctioned (pure scheme)
₹261.85 Cr
Expenditure since inception
₹182.50 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
2,309 works
₹57.91 Cr sanctioned
₹23.03 Cr spent (40%)
02
Construction of Road and Culvert
686 works
₹41.25 Cr sanctioned
₹29.16 Cr spent (71%)
03
Construction of Check Dam/Stop Dam
2,728 works
₹36.38 Cr sanctioned
₹26.55 Cr spent (73%)
04
Rural Housing
17,215 works
₹30.09 Cr sanctioned
₹28.60 Cr spent (95%)
05
Construction of Tank
548 works
₹15.83 Cr sanctioned
₹13.06 Cr spent (82%)
06
Construction of Well
551 works
₹12.42 Cr sanctioned
₹9.90 Cr spent (80%)
07
Constr of Cement Concrete Roads
1,038 works
₹10.87 Cr sanctioned
₹8.34 Cr spent (77%)
08
Construction of Trench
457 works
₹9.49 Cr sanctioned
₹7.77 Cr spent (82%)
09
Land Development
985 works
₹7.93 Cr sanctioned
₹4.77 Cr spent (60%)
10
Construction of Percolation Tank
154 works
₹7.93 Cr sanctioned
₹7.00 Cr spent (88%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 17,215 30.09 28.60
95%
2 Construction of Check Dam/Stop Dam 2,728 36.38 26.55
73%
3 Plantation 2,309 57.91 23.03
40%
4 Construction of Toilets 1,079 1.60 1.25
78%
5 Constr of Cement Concrete Roads 1,038 10.87 8.34
77%
6 Land Development 985 7.93 4.77
60%
7 Farm Pond 700 6.52 4.69
72%
8 Construction of Road and Culvert 686 41.25 29.16
71%
9 Construction of Well 551 12.42 9.90
80%
10 Construction of Tank 548 15.83 13.06
83%
11 Construction of Trench 457 9.49 7.77
82%
12 Construction of Recharge Pits 392 3.87 1.89
49%
13 Solid and Liquid Waste Management 296 1.15 0.85
74%
14 Goat Shelter 264 2.24 2.07
93%
15 Construction of Percolation Tank 154 7.93 7.00
88%
16 Construction of Bund 137 2.10 1.90
91%
17 Boulder Check/Gully Plug 120 0.58 0.45
77%
18 Well Recharge 114 2.28 1.86
82%
19 Construction of NADEP/Vermi Compost Pit 70 0.22 0.16
69%
20 Construction of Crematorium 54 1.06 0.87
82%
21 Roof Water Harvesting on gov/panchayat bldg 53 0.40 0.29
71%
22 Cattle Shed 48 0.41 0.36
89%
23 Repair & maint of Pond/ Tank 47 0.56 0.37
66%
24 Constr of GP Bhawan 32 1.34 1.30
97%
25 Community Sanitary Complex 31 0.21 0.15
72%
26 Constr of Aganwadi 25 0.56 0.49
86%
27 Repair & Maint of Check Dam/Stop Dam 22 0.79 0.66
84%
28 Terracing 18 0.17 0.12
72%
29 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 18 0.68 0.59
87%
30 Renovation of traditional water bodies 17 0.13 0.12
96%
31 Culvert 17 0.63 0.52
84%
32 Other Works 16 0.24 0.12
50%
33 Construction of Play field 15 0.24 0.17
69%
34 Repair & maint of Road 14 0.25 0.25
98%
35 Construction of Spur 10 0.17 0.16
93%
36 Repair & maint of Water Harvesting Structures 9 0.11 0.06
57%
37 Works for Flood Control and Protection 8 0.83 0.55
67%
38 Constr of Food Grain storage 8 0.28 0.26
95%
39 Constr of Kitchen Shed 7 0.03 0.02
72%
40 Constr of Compound wall 7 0.38 0.34
90%
41 Underground Dyke for Ground Water Recharge 7 0.14 0.14
96%
42 Constr of Gabion 5 0.08 0.07
84%
43 Bio-Fertilizer 5 0.02 0.02
69%
44 Construction of Fish Drying Infrastructure 4 0.05 0.04
74%
45 Repaire and Maint of NADEP/Vermi Compost Pit 4 0.02 0.01
44%
46 Nursery Development 3 0.51 0.49
97%
47 Construction of building/workshed for SHG 3 0.03 0.02
70%
48 Repair & maint of Percolation Tank 2 0.13 0.13
95%
49 Construction of Embankment 2 0.21 0.19
93%
50 Grass Land Development 2 0.13 0.04
32%
51 Poultry Shelter 2 0.01 0.01
93%
52 Repair & Maint of Community infrastructure 1 0.02 0.02
99%
53 Strengthening of Embankment 1 0.33 0.21
63%
54 Deepening / Desilting of Flood Channels 1 0.01 0.01
148%
Total 30,361 261.85 182.50
All 54 rows (zero-value rows hidden) ⇩ Export to Excel