Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
62 works
₹2.03 Cr sanctioned
₹1.55 Cr spent (76%)
02
Construction of Road and Culvert
5 works
₹37.09 L sanctioned
₹30.17 L spent (81%)
03
Construction of Well
12 works
₹25.31 L sanctioned
₹23.19 L spent (92%)
04
Works for Flood Control and Protection
1 works
₹24.99 L sanctioned
₹23.19 L spent (93%)
05
Construction of Trench
25 works
₹19.01 L sanctioned
₹15.81 L spent (83%)
06
Rural Housing
78 works
₹15.79 L sanctioned
₹15.47 L spent (98%)
07
Repair & Maint of Check Dam/Stop Dam
1 works
₹12.98 L sanctioned
₹11.44 L spent (88%)
08
Construction of Percolation Tank
3 works
₹9.65 L sanctioned
₹6.30 L spent (65%)
09
Constr of Cement Concrete Roads
12 works
₹9.22 L sanctioned
₹8.91 L spent (97%)
10
Construction of Check Dam/Stop Dam
13 works
₹6.62 L sanctioned
₹5.79 L spent (87%)